View Post

AT&T 9th and 10th Floors

AT&T 9th and 10th FloorsAT&T 9th and 10th FloorsWorked with BEAR Construction to build out the interior office spaces on the 9th & 10th Floor for the AT&T Center at 200 W. Adams. DIVISIONS UTILIZED Framing Drywall Taping ACT Rough Carpentry PaintingLocation:200 West Adams Street Chicago, IL 60606Contractor:Bear ConstructionCost:N/AProject Status:CompletedPhoto Gallery

View Post

IDPH - 35th Floor

IDPH – 35th FloorIDPH – 35th FloorWorked with BEAR Construction to remodel the existing interior office space on the 35th Floor for the Illinois Department of Public Health at 69 W. Washington.DIVISIONS UTILIZED Framing Drywall Taping ACT Rough Carpentry PaintingLocation:69 West Washington Chicago, IL 60602Contractor:Bear ConstructionCost:N/AProject Status:CompletedPhoto Gallery

View Post

11th FL Spec Suite

11th FL Spec Suite11th FL Spec SuiteWithin the 100+-year-old historic building, BEAR built the 19K-SF 11th Floor Spec Suite and Corridors. The space features an open floor plan with glass fronts, curved pendant lighting, custom millwork at the reception entry and beautiful arch-shaped details that are carried throughout the space in the pantry area, at doorways and as decorative paint …

View Post

Fulton Labs in West Town

Fulton Labs in West TownFulton Labs in West TownFulton Labs at 400 N Aberdeen is a mixed-use development located in Chicago’s Fulton Market District. This brand-new complex includes a combination of research and development lab space infrastructure and business amenities to optimize discovery.  The state-of-the-art facility is home to a 40,000 square foot Hydrotech Garden Roof® and Ultimate Assembly®, kept watertight …